Add power.Keep growing.

Meet the plug-and-play energy infrastructure for sites that can’t wait years for the grid.

Distributed On-demand Resource. The DOR is in pre-pilot development. Each unit targets 200 kW of rated electrical output from approximately 230 kW of mechanical input. First pilot deployments are planned for 2027.

Illustrative rendering of the planned DOR modular power unit

Traction, partners & recognition

The interconnection queue holds 2,600 gigawatts. Typical waits now run 7-10+ years.

Electrification is outrunning the grid. Immedia Power is developing a distributed power platform for fleets, data centers, and industrial sites that need on-site capacity without waiting on a major grid upgrade.

Read the market case GRID INTERCONNECTION · 7-10+ YEARS DOR · SITE-SPECIFIC DEPLOYMENT

700-kilogram system target. Built for compact handling.

Designed for forklift handling and a compact installation footprint. Final foundation, fuel connection, permitting, and interconnection requirements are confirmed during the site survey.

700 kg
Unit-weight target
15 ft²
Footprint target
3
Pickup-handling concept

A 200-kilowatt output target.

The planned DOR package targets pallet-jack handling instead of container-scale crane placement.

Container-scale backup-only power unit lowered onto a site by crane
The old way
One container, one crane
Illustrative image of planned DOR pallet-jack and pickup handling
Planned DOR package
Pickup-handling concept

Designed for space-constrained sites.

The DOR targets 69 dB at five meters in a compact, behind-the-meter platform.

Stack five. Target one megawatt.

Multi-unit operation, Power OS load sharing, redundancy, and scaling in 200 kW steps are planned capabilities subject to integrated-system testing.

Planned applications

Six settings illustrate future pilots where additional on-site power capacity could matter.

Planned commercial structures

Final availability, service scope, responsibilities, and contract terms will be established for future deployments.

Equipment sale

Planned structure: the customer would own and operate the unit. Final maintenance and OEM support scope is not yet established.

Planned customer ownership
One-time capex

3-year lease

Planned structure: Immedia Power or a financing partner would own the hardware. Final monitoring, maintenance, and service terms are not yet established.

Planned provider ownership
Recurring payment

Power-as-a-Service

Planned structure: provider ownership and a per-kilowatt-hour fee after validation and commercialization. Final operations, fuel, and maintenance scope is not yet established.

Planned provider operation
Per kWh

Built by a team shaped by motorsport and aviation

Our wider technical team brings the performance culture of motorsport and aviation to distributed power, with a focus on power density, thermal control, fast response, reliability, and disciplined validation.

Named a Top Ten All Star at Energy Tech Week 2026, selected from hundreds of applicant startups.

Power before the grid arrives

Tell us about your site. We respond with a deployment assessment and site-specific economics.