Add power.Keep growing.
Meet the plug-and-play energy infrastructure for sites that can’t wait years for the grid.
Distributed On-demand Resource. The DOR is in pre-pilot development. Each unit targets 200 kW of rated electrical output from approximately 230 kW of mechanical input. First pilot deployments are planned for 2027.

The interconnection queue holds 2,600 gigawatts. Typical waits now run 7-10+ years.
Electrification is outrunning the grid. Immedia Power is developing a distributed power platform for fleets, data centers, and industrial sites that need on-site capacity without waiting on a major grid upgrade.
Read the market case700-kilogram system target. Built for compact handling.
Designed for forklift handling and a compact installation footprint. Final foundation, fuel connection, permitting, and interconnection requirements are confirmed during the site survey.
A 200-kilowatt output target.
The planned DOR package targets pallet-jack handling instead of container-scale crane placement.
Designed for space-constrained sites.
The DOR targets 69 dB at five meters in a compact, behind-the-meter platform.
Stack five. Target one megawatt.
Multi-unit operation, Power OS load sharing, redundancy, and scaling in 200 kW steps are planned capabilities subject to integrated-system testing.
Planned applications
Six settings illustrate future pilots where additional on-site power capacity could matter.
EV and airport charging
Future temporary or permanent capacity.
Edge data centers
Planned bridge or on-site capacity.
Commercial and industrial
Planned behind-the-meter capacity.
Real estate and development
Future bridge-power applications.
Ports
Potential shore-power and yard applications.
Oil and gas
Potential site-approved gaseous-fuel applications.
Planned commercial structures
Final availability, service scope, responsibilities, and contract terms will be established for future deployments.
Equipment sale
Planned structure: the customer would own and operate the unit. Final maintenance and OEM support scope is not yet established.
3-year lease
Planned structure: Immedia Power or a financing partner would own the hardware. Final monitoring, maintenance, and service terms are not yet established.
Power-as-a-Service
Planned structure: provider ownership and a per-kilowatt-hour fee after validation and commercialization. Final operations, fuel, and maintenance scope is not yet established.
Built by a team shaped by motorsport and aviation
Our wider technical team brings the performance culture of motorsport and aviation to distributed power, with a focus on power density, thermal control, fast response, reliability, and disciplined validation.
Named a Top Ten All Star at Energy Tech Week 2026, selected from hundreds of applicant startups.
Power before the grid arrives
Tell us about your site. We respond with a deployment assessment and site-specific economics.







